Frequently Asked Questions

Design, Engineering & Permitting

Q: Do I need a permit?

A: Typically yes, with the ultimate responsibility for the permit resting with the purchaser of the equipment. Each building department jurisdiction may have specific requirements and you are encouraged to contact them for more information if you desire. DACO can act as your representative to the city or you can inquire yourself.

Q: What is the process and requirements for obtaining a permit?

A: Each building department has their own specific requirements for submitting for a permit, so contact them for specifics. Typically the permit application process requires an engineer stamped set of drawings and calculations which show the building, location and details of the system to be installed. These drawings typically will include site plan details, concrete details, and fire protection information. The building department may also request special inspections as part of the permit process. Once the application for permit has been submitted for review plan check comments may follow, requiring corrections or changes prior to issuing. This process may be handled over the counter or can take several weeks to months. After the permit has been issued, installation begins and special inspections are done. Following the completion of the install the building department is called for the final inspection.

Q: How much does a permit cost?

A: Permits are sometimes priced out based on the value of the job, number of bays or total SF. Contact them for more information. Local jurisdictions employ a variety of methods to establish permit fees.