
INDUSTRIAL
METAL SHELVING
CUSTOMIZABLE STORAGE SYSTEMS
With every company’s metal shelving system requirements being different, metal shelving unit and metal storage cabinet solutions available are unique, as well. One size fits all just will not work, and luckily doesn’t have to.
Whether you are needing to archive your files, organize your stockroom, stock your automotive parts department, store your athletic gear, or organize small parts in your maintenance department, there is a metal shelving unit or storage cabinet available to fit your specific needs.
We proudly feature Borrough’s metal shelving units & metal cabinet product line to fit any and all of your business or warehouse needs.
TRUSTED METAL SHELVING & CABINET SYSTEM SOLUTIONS
DESIGN & INSTALLATION ALSO AVAILABLE
In addition to providing quality industrial shelving, cabinet, and modular drawer solutions, we will work with you to design and layout the ideal system for your facility and operations. But we don’t stop there; we will assist you with understanding building codes and permitting if necessary, and be by your side the entire way through installation.
Our many years of experience, attention to detail, and laser-measured & computer drawn layouts, allow us to better understand your needs and goals, and make them come to life from paper to installation.
BENEFITS OF INDUSTRIAL SHELVING UNITS
INCREASE STORAGE SPACE
ADJUSTABLE
INCREASE PRODUCT VISIBILITY
SMALL, LARGE AND DELICATE ITEM STORAGE
EASY TO ASSEMBLE
COST EFFECTIVE
APPLICATIONS IDEAL FOR INDUSTRIAL METAL SHELVING
- Small Parts Storage
- Record Archive Storage
- Multi-Level Catwalk
- Tire Storage
- Battery Storage
- Backroom Retail Shelving
- Shoe Box storage
- Medical Record Storage
- Auto parts Shelving
- Custom Design for any application
- Shipping tables & work benches
ADDITIONAL OPTIONS
- Heavy Duty Posts
- Custom Decking
- Wire Shelves
- Foot plates to accept concrete anchors
- Custom Colors and finishes
- Engineering documents
- Permit Submittals, if required
FEATURES OF METAL SHELVING UNITS
SHELVING UNITS
STANDARD INDUSTRIAL METAL SHELVING
SHELVING UNITS
CAPACITIES PER SHELF
SHELF DECK MATERIAL
METAL SHELVING
HIGH BAY AND MEZZANINE SYSTEMS
LARGE IN STOCK INVENTORY
We stock several styles of metal shelving available for quick shipment.

WHICH METAL SHELVING SYSTEM IS RIGHT FOR YOU?
With so many metal shelving systems to choose from, deciding which type is right for your business can be a challenge. DACO has years of experience helping our customers increase and maximize their storage space by picking the right system for their business. We look forward to partnering with you to help you do just that.
CONTACT US TODAY